.

Thursday, February 21, 2019

Ops 571 Final

What is the net result of reducing the duration of a task (crashing) not on the critical path? A. Decreased task overhead approachs B. Reduced likelihood of liquidated damages for late address C. Increased slack time associated with the task D. Reduction in the exteriorise duration 12) The idea of the value density calculation is A. finding a carrier that can handle the weight B. matching the weight of the convergence with an appropriate carrier C. deciding where items should be stocked geographically and how they should be shippedD. finding the minimum cost carrier 13) When designing a fork over chain A. cost vs customer service must be considered B. smell vs cost must be considered C. lead times vs payment call must be considered D. customer service vs product customization must be considered 14) According to Hau Lee, which of the fol pooring types of products need to be delivered with efficient supply-chains? A. Custom products B. groundbreaking products C. Grocery produc ts D. High technology products 5) Which of the following product promotional activities would probably help make the supply chain more efficient? A. scathe promotions that expire on a particular date B. An everyday low damage strategy where prices are not dependent on amount delivered with a specific order C. Special packaging for a specific event that occurs one time each year D. A 2-for-1 price promotion 16) The top hat operating aim is A. the maximum point of the cost curve B. the level of capacity for which average unit cost is decrease C. aximum capacity D. the level of capacity for which total cost is minimized 17) capability utilization rate can be computed as A. Capacity utilize best operating level B. Capacity used x best operating level C. Capacity used / best operating level D. Capacity used + best operating level 18) The objective of __________ is to deliver an approach for determining the overall capacity level of capital-intensive resources that best suppor ts the companys long competitive strategy. A. workforce management B. management supervision C. perations management D. strategical capacity planning 19) Lean production systems typically require A. lecture of large lots at frequent intervals B. buyer inspection of goods and materials C. quaternate sources from which to purchase D. low inventory levels throughout production 20) Given that the front forecast of 65 turned out to be four units less(prenominal) than the actual demand the next forecast is 66. What would be the value of important if the simple exponential smoothing forecast method is being used? A. 0. 02 B. 0. 4 C. 0. 04 D. 0. 25

No comments:

Post a Comment